TS TripShrip.
Advertisement

Train · 12101

Jnaneswari Express

Run-day calendar

Mon
Tue
Wed
Thu
Fri
Sat
Sun

18 halts · 1,950 km

From → To

Lokmanya Tilak Term Kolkata Shalimar

LTT → SHM

Advertisement

Stations en route

All scheduled timing points. Stations with identical arrival / departure times are pass-throughs — the train doesn't stop for boarding.

# Station Code Arrive Depart km
1 Lokmanya Tilak Term LTT 20:35:00 0
2 Kalyan Jn KYN 21:12:00 21:15:00 38
3 Bhusaval Jn BSL 02:50:00 02:55:00 429
4 Akola Jn AK 04:50:00 04:55:00 569
5 Badnera Jn BD 06:20:00 06:23:00 647
6 Nagpur NGP 09:35:00 09:40:00 821
7 Gondia Jn G 11:18:00 11:20:00 951
8 Raj Nandgaon RJN 12:40:00 12:42:00 1,056
9 Durg DURG 13:30:00 13:35:00 1,087
10 Raipur Jn R 14:10:00 14:15:00 1,124
11 Bilaspur Jn BSP 16:05:00 16:20:00 1,234
12 Jharsuguda Jn JSG 19:15:00 19:17:00 1,438
13 Rourkela ROU 20:42:00 20:50:00 1,539
14 Chakradharpur CKP 22:15:00 22:20:00 1,640
15 Tatanagar Jn TATA 23:13:00 23:20:00 1,703
16 Kharagpur Jn KGP 01:25:00 01:30:00 1,837
17 Santragachi Jn SRC 03:03:00 03:05:00 1,945
18 Kolkata Shalimar SHM 04:35:00 1,950

Major halts on this route

Stations with the longest stops on the Jnaneswari Express timetable.

Travel options between Lokmanya Tilak Term Kolkata Shalimar

Other trains via Lokmanya Tilak Term (LTT)

Other trains via Kolkata Shalimar (SHM)

Frequently asked questions about train 12101

Q1 What is the route of Train 12101 Jnaneswari Express?
Train 12101 runs from Lokmanya Tilak Term (LTT) to Kolkata Shalimar (SHM), covering a total distance of 1,950 km via 18 halts.
Q2 From which station does train 12101 originate?
Train 12101 starts from Lokmanya Tilak Term (LTT) and departs at 20:35.
Q3 What is the final destination of Train 12101 Jnaneswari Express?
Train 12101 terminates at Kolkata Shalimar (SHM), arriving at 04:35 on day 3 of the journey.
Q4 How many halts does 12101 Jnaneswari Express have?
Train 12101 has 18 bookable halts including the origin (LTT) and destination (SHM).
Q5 On which days of the week does train 12101 run?
Train 12101 runs on Monday, Tuesday, Friday, Saturday.
Q6 What is the total distance covered by train 12101?
Train 12101 covers a total distance of 1,950 km from Lokmanya Tilak Term to Kolkata Shalimar.
Q7 What is the journey duration of train 12101?
Train 12101 takes approximately 32 hours 0 minutes from Lokmanya Tilak Term to Kolkata Shalimar — departs at 20:35 and arrives at 04:35 on day 3.
Q8 What is the average speed of train 12101?
Train 12101 runs at an average speed of about 61 km/h, covering 1,950 km in approximately 32 hours 0 minutes.
Q9 What type of train is 12101?
12101 Jnaneswari Express is classified as a SUPERFAST train on Indian Railways.
Q10 What is the longest halt on train 12101's route?
The longest halt on train 12101 is at Bilaspur Jn (BSP) for 15 minutes.
Q11 Which is the first major halt of train 12101 after Lokmanya Tilak Term?
After leaving Lokmanya Tilak Term, train 12101 makes its first halt at Kalyan Jn (KYN), arriving at 21:12.
Q12 What time does train 12101 reach Raipur Jn?
Train 12101 arrives at Raipur Jn (R) at 14:10 on day 2 and departs at 14:15.
Q13 What time does train 12101 reach Kolkata Shalimar?
Train 12101 arrives at Kolkata Shalimar (SHM) at 04:35 on day 3 of the journey.
Q14 Is train 12101 a daily train?
No, train 12101 does not run daily. It operates on 4 day(s) per week: Monday, Tuesday, Friday, Saturday.
Q15 What is the train number for Jnaneswari Express?
The Indian Railways train number for Jnaneswari Express is 12101.
Advertisement

We use cookies for traffic measurement and to remember preferences. No personalized advertising. See our privacy policy.