TS TripShrip.
Advertisement

Train · 14312

Ala Hazrat Express (via Mahesana)

Run-day calendar

Mon
Tue
Wed
Thu
Fri
Sat
Sun

49 halts · 1,525 km

From → To

Bhuj Bareilly

BHUJ → BE

Advertisement

Stations en route

All scheduled timing points. Stations with identical arrival / departure times are pass-throughs — the train doesn't stop for boarding.

# Station Code Arrive Depart km
1 Bhuj BHUJ 16:15:00 0
2 Anjar AJE 16:43:00 16:45:00 42
3 Adipur AI 16:54:00 16:56:00 49
4 Gandhidham Bypass Cabin Xx GIMB 17:20:00 17:40:00 57
5 Bhachau Bg BCOB 18:12:00 18:14:00 94
6 Samakhiali Jn SIOB 18:35:00 18:37:00 111
7 Maliya Miyana MALB 19:08:00 19:10:00 152
8 Halvad HVD 19:43:00 19:45:00 197
9 Dhrangdhra DHG 20:14:00 20:16:00 228
10 Viramgam Jn VG 21:25:00 21:27:00 293
11 Chandlodiya CLDY 22:16:00 22:21:00 347
12 Mahesana Jn MSH 23:14:00 23:16:00 409
13 Palanpur Jn PNU 00:37:00 00:42:00 474
14 Abu Road ABR 01:20:00 01:30:00 527
15 Falna FA 02:40:00 02:42:00 625
16 Marwar Jn MJ 03:30:00 03:35:00 692
17 Sojat Road SOD 03:53:00 03:55:00 713
18 Sendra SEU 04:26:00 04:28:00 766
19 Beawar BER 04:56:00 04:58:00 780
20 Ajmer Jn AII 06:05:00 06:15:00 832
21 Kishangarh KSG 06:38:00 06:40:00 857
22 Naraina NRI 07:11:00 07:13:00 901
23 Phulera Jn FL 07:28:00 07:30:00 912
24 Jaipur JP 08:20:00 08:30:00 966
25 Gandhinagar Jaipur GADJ 08:41:00 08:44:00 972
26 Getor Jagatpura GTJT 08:51:00 08:53:00 977
27 Dausa DO 09:26:00 09:28:00 1,028
28 Bandikui Jn BKI 09:50:00 09:55:00 1,057
29 Rajgarh RHG 10:15:00 10:17:00 1,081
30 Malakhera MKH 10:43:00 10:45:00 1,098
31 Alwar AWR 10:50:00 10:53:00 1,117
32 Khairthal KRH 11:13:00 11:15:00 1,144
33 Rewari RE 12:26:00 12:28:00 1,191
34 Pataudi Road PTRD 12:48:00 12:50:00 1,213
35 Garhi Harsaru GHH 13:07:00 13:09:00 1,233
36 Gurgaon GGN 13:19:00 13:21:00 1,243
37 Palam PM 13:33:00 13:35:00 1,256
38 Delhi Cantt DEC 13:41:00 13:43:00 1,260
39 Delhi Sarai Rohilla DEE 14:04:00 14:06:00 1,269
40 Old Delhi DLI 14:35:00 14:50:00 1,273
41 Ghaziabad GZB 15:34:00 15:36:00 1,293
42 Pilkhua PKW 16:04:00 16:06:00 1,319
43 Hapur HPU 16:18:00 16:23:00 1,330
44 Gajraula Jn GJL 17:01:00 17:03:00 1,381
45 Amroha AMRO 17:22:00 17:24:00 1,404
46 Moradabad MB 18:25:00 18:30:00 1,434
47 Rampur RMU 19:01:00 19:03:00 1,462
48 Milak MIL 19:23:00 19:25:00 1,485
49 Bareilly BE 20:35:00 1,525

Major halts on this route

Stations with the longest stops on the Ala Hazrat Express (via Mahesana) timetable.

Travel options between Bhuj Bareilly

Other trains via Bhuj (BHUJ)

Other trains via Bareilly (BE)

Frequently asked questions about train 14312

Q1 What is the route of Train 14312 Ala Hazrat Express (via Mahesana)?
Train 14312 runs from Bhuj (BHUJ) to Bareilly (BE), covering a total distance of 1,525 km via 49 halts.
Q2 From which station does train 14312 originate?
Train 14312 starts from Bhuj (BHUJ) and departs at 16:15.
Q3 What is the final destination of Train 14312 Ala Hazrat Express (via Mahesana)?
Train 14312 terminates at Bareilly (BE), arriving at 20:35 on day 2 of the journey.
Q4 How many halts does 14312 Ala Hazrat Express (via Mahesana) have?
Train 14312 has 49 bookable halts including the origin (BHUJ) and destination (BE).
Q5 On which days of the week does train 14312 run?
Train 14312 runs on Tuesday, Wednesday, Friday.
Q6 What is the total distance covered by train 14312?
Train 14312 covers a total distance of 1,525 km from Bhuj to Bareilly.
Q7 What is the journey duration of train 14312?
Train 14312 takes approximately 28 hours 20 minutes from Bhuj to Bareilly — departs at 16:15 and arrives at 20:35 on day 2.
Q8 What is the average speed of train 14312?
Train 14312 runs at an average speed of about 54 km/h, covering 1,525 km in approximately 28 hours 20 minutes.
Q9 What type of train is 14312?
14312 Ala Hazrat Express (via Mahesana) is classified as a MAIL EXPRESS train on Indian Railways.
Q10 What is the longest halt on train 14312's route?
The longest halt on train 14312 is at Gandhidham Bypass Cabin Xx (GIMB) for 20 minutes.
Q11 Which is the first major halt of train 14312 after Bhuj?
After leaving Bhuj, train 14312 makes its first halt at Anjar (AJE), arriving at 16:43.
Q12 What time does train 14312 reach Gandhinagar Jaipur?
Train 14312 arrives at Gandhinagar Jaipur (GADJ) at 08:41 on day 2 and departs at 08:44.
Q13 What time does train 14312 reach Bareilly?
Train 14312 arrives at Bareilly (BE) at 20:35 on day 2 of the journey.
Q14 Is train 14312 a daily train?
No, train 14312 does not run daily. It operates on 3 day(s) per week: Tuesday, Wednesday, Friday.
Q15 What is the train number for Ala Hazrat Express (via Mahesana)?
The Indian Railways train number for Ala Hazrat Express (via Mahesana) is 14312.
Advertisement

We use cookies for traffic measurement and to remember preferences. No personalized advertising. See our privacy policy.