Advertisement
Advertisement
Train · 12814
Steel Express
Run-day calendar
Mon
Tue
Wed
Thu
Fri
Sat
Sun
9 halts · 250 km
From → To
Tatanagar Jn → Howrah Jn
TATA → HWH
Advertisement
Stations en route
All scheduled timing points. Stations with identical arrival / departure times are pass-throughs — the train doesn't stop for boarding.
| # | Station | Code | Arrive | Depart | km |
|---|---|---|---|---|---|
| 1 | Tatanagar Jn | TATA | — | 06:05:00 | 0 |
| 2 | Rakha Mines | RHE | 06:33:00 | 06:35:00 | 20 |
| 3 | Ghatsila | GTS | 06:47:00 | 06:49:00 | 37 |
| 4 | Chakulia | CKU | 07:10:00 | 07:12:00 | 67 |
| 5 | Jhargram | JGM | 07:32:00 | 07:34:00 | 96 |
| 6 | Sardiha | SUA | 07:47:00 | 07:48:00 | 112 |
| 7 | Kharagpur Jn | KGP | 08:18:00 | 08:20:00 | 135 |
| 8 | Santragachi Jn | SRC | 09:40:00 | 09:42:00 | 242 |
| 9 | Howrah Jn | HWH | 10:35:00 | — | 250 |
Major halts on this route
Stations with the longest stops on the Steel Express timetable.
Travel options between Tatanagar Jn ↔ Howrah Jn
Other trains via Tatanagar Jn (TATA)
Other trains via Howrah Jn (HWH)
Frequently asked questions about train 12814
Q1 What is the route of Train 12814 Steel Express?
Train 12814 runs from Tatanagar Jn (TATA) to Howrah Jn (HWH), covering a total distance of 250 km via 9 halts.
Q2 From which station does train 12814 originate?
Train 12814 starts from Tatanagar Jn (TATA) and departs at 06:05.
Q3 What is the final destination of Train 12814 Steel Express?
Train 12814 terminates at Howrah Jn (HWH), arriving at 10:35.
Q4 How many halts does 12814 Steel Express have?
Train 12814 has 9 bookable halts including the origin (TATA) and destination (HWH).
Q5 On which days of the week does train 12814 run?
Train 12814 runs every day of the week (Monday to Sunday).
Q6 What is the total distance covered by train 12814?
Train 12814 covers a total distance of 250 km from Tatanagar Jn to Howrah Jn.
Q7 What is the journey duration of train 12814?
Train 12814 takes approximately 4 hours 30 minutes from Tatanagar Jn to Howrah Jn — departs at 06:05 and arrives at 10:35.
Q8 What is the average speed of train 12814?
Train 12814 runs at an average speed of about 56 km/h, covering 250 km in approximately 4 hours 30 minutes.
Q9 What type of train is 12814?
12814 Steel Express is classified as a MAIL EXPRESS train on Indian Railways.
Q10 What is the longest halt on train 12814's route?
The longest halt on train 12814 is at Rakha Mines (RHE) for 2 minutes.
Q11 Which is the first major halt of train 12814 after Tatanagar Jn?
After leaving Tatanagar Jn, train 12814 makes its first halt at Rakha Mines (RHE), arriving at 06:33.
Q12 What time does train 12814 reach Jhargram?
Train 12814 arrives at Jhargram (JGM) at 07:32 and departs at 07:34.
Q13 What time does train 12814 reach Howrah Jn?
Train 12814 arrives at Howrah Jn (HWH) at 10:35.
Q14 Is train 12814 a daily train?
Yes, train 12814 runs daily — every day of the week.
Q15 What is the train number for Steel Express?
The Indian Railways train number for Steel Express is 12814.
Advertisement
Advertisement